COLDFRAME

Grid export · 9.4 MW

CF-00 / Direct-to-chipRjukan · 59.88° NRev 26.10

Hall B on the grid · 52 racks live

In 32 °COut 45 °CΔT 13.6 K

Liquid cooling for 120 kW racks

Cold plates.Warm water.No chillers.

We take heat off the silicon at 32 °C, carry it out of the hall at 45 °C, and sell it to the town's district heating grid instead of venting it to the sky.

CF-01 / Thermal fieldHall A
Supply
32.0 °C
Return
45.6 °C
Flow
1,420 L/min
Load
4.8 MW
CF-02 / Loops4 halls

CF-03 / Facility PUE

1.06

Annualised, metered at the utility transformer. Industry median: 1.56.

Heat reused

71%

of all rejected heat, sold to Tinn Energi

Water consumed

0.00L/kWh

closed loop, no evaporative towers

Racks cooled

108

across three halls, two towns

Unplanned downtime

0min

since the first loop was filled

CF-10 / The loop4 stages · 1 boundary

Heat travels one sealed path, from the die to the radiator in somebody's kitchen.

Air never carries the load. Fans in the hall only move the 8 % that the cold plates cannot reach — memory, NICs, power supplies — so the room stays quiet and the floor stays dry.

CF-11On the silicon

Cold plate

A skived-copper plate sits on every accelerator and CPU. 0.06 °C/W from junction to water, 1.2 bar drop at full flow.

CF-12In the rack

Rack manifold

Dripless quick-disconnects, one pair per server. A tray comes out in eleven seconds without draining the loop.

CF-13End of row

Coolant distribution unit

N+1 pumps, 25 µm filtration and a leak model that compares supply and return mass every 200 ms.

CF-14Outside the wall

Heat exchange

Plate exchangers hand 45 °C water to the Tinn district grid. Dry coolers on the roof take the summer surplus.

CF-20 / SpecificationSheet CF-SP-26.10

Numbers we put in the contract.

Every figure on this sheet is a service level, not a brochure claim. Miss one for a quarter and the cooling fee for that hall drops by a fifth.

Download CF-SP-26.10 (PDF, 2.4 MB)
Rack density
40–160 kWper rack, liquid share ≥ 92 %
Supply water
30–35 °Cno compressor, no chiller plant
Return water
44–48 °Cgrid-grade, sold not vented
Water use
0.00 L/kWhsealed loop, filled once
Leak response
< 400 msvalve closure, per manifold
Retrofit window
9 nightstypical 2 MW hall, live
CF-30 / DeploymentsUpdated 02 Oct 2026

Where the loops run.

  • RJK-ARjukan, NOTraining cluster, 38 racks4.8 MWLive since Mar 2025
  • RJK-BRjukan, NOInference, 52 racks6.2 MWLive since Jan 2026
  • NTD-CNotodden, NOResearch HPC, 18 racks2.1 MWBurn-in, week 3 of 6
  • LUL-01Luleå, SEColocation retrofit3.4 MWSurvey signed
  • NTD-DNotodden, NOReserved7.0 MWQ2 2027

CF-40 / Loop survey

Bring us a floor plan and a power budget.

Two engineers, one day on site, and a written answer within a fortnight: what a warm-water loop costs in your hall, how many nights the retrofit takes, and who in your town would buy the heat.