← All skills

Dogger Ridge · wind 11.4 m/s WSW

Wind, kept
on schedule.

Brisa North operates 412 turbines across three North Sea farms. Sixteen suppliers feed one control room in Aberdeen, so a fault offshore becomes a work order before the blades slow down.

See the stack
Output now2,184 MW
Availability97.6 %
T-217 · Dogger Ridge BYaw 247° · 14.2 rpm

Wired into one control room — 8 of 16 suppliers

01 / The stack

Sixteen suppliers, one telemetry bus.

Every partner is monochrome until you need to find it. Hover or tab across the grid and the brand colour comes back, along with what that supplier is responsible for right now.

010203040506

02 / Anatomy

One turbine, six signatures.

  1. 01Weather, upstreamSatellite wind fields arrive before the gust does, so yaw starts turning early.
  2. 02Blades, 81 mDrones photograph every leading edge twice a season; erosion is graded, not guessed.
  3. 03NacelleDirect-drive generator, no gearbox to fail at 90 metres above the sea.
  4. 04Main bearingAccelerometers listen for the 0.3 Hz hum that precedes a bearing failure.
  5. 05Tower baseProtection relays and SCADA talk to the control room every 250 ms.
  6. 06Export cableHigh-voltage DC carries the whole farm 112 km to shore at under 3 % loss.

03 / Fleet

Three farms, one shift pattern.

Dogger Ridge

1,056 MW

Turbines
176 turbines
Distance
112 km offshore
Status
Commissioned 2021

Silver Pit

852 MW

Turbines
142 turbines
Distance
74 km offshore
Status
Commissioned 2023

Outer Wash

470 MW

Turbines
94 turbines
Distance
41 km offshore
Status
Repowering 2027

Supplying a North Sea farm? Plug into the bus.

Our integration desk onboards one new partner a quarter. Bring an API, a maintenance window and a named engineer.

Talk to the integration desk